Porter
Township
HC 12 Box
461
Dingmans
Ferry, PA
18328
570-223-0447
570-775-7734 Fax
Sewage Enforcement Officer: Ron Tussel 570-237-6454
Sewage Inspections Required
You have been issued a permit to construct an on lot sewage disposal
system within this municipality.
Notice to begin construction is required by the sewage
enforcement office.
Inspections and approvals are required during construction phases.
Please read the following list of requirements carefully.
1)
72 HOURS MINIMUM NOTICE FOR START OF CONSTRUCTION AND ALL INTERIM AND
FINAL INSPECTIONS
2)
First Inspection: Chisel plow, six-inch depth maximum.
3)
Second Inspection: SAND – have tear slips showing total amount of sand
installed, along with DOT certification from supplier of the sand used.
4)
Third Inspection: Pressure Test – be sure pump installed meets design
criteria. Have electricity
supplied to fire the pump and produce 3’ minimum head at highest lateral
end.
5) Final Inspection: call when the bed is covered, seeded and mulched.
Alarm must be audible on the exterior of the home, or someone must be
there to allow access.